Installation of card sleeve pipe joints
1. Overview of ferrule joints
The ferrule type pipe joint is composed of three parts: the joint body, the ferrule, and the nut. When the ferrule and nut sleeve are inserted into the joint body on the steel pipe, when the nut is tightened, the outer side of the front end of the ferrule fits with the taper surface of the joint body, and the inner blade bites into the seamless steel pipe evenly to form an effective seal.


Second, the assembly of the ferrule joint
installation
1、Saw a suitable length of seamless steel pipe to remove port burrs. The end face of the steel pipe should be perpendicular to the axis, and the angle tolerance should not be greater than 0.5 degrees. If the steel pipe needs to be bent, the length of the straight line from the end face of the steel pipe to the bent part cannot be less than three times the length of the nut.

2、Set the nut and ferrule on the seamless steel tube. Pay attention to the direction of the nut and ferrule, do not install it backwards.

3、Apply lubricating oil on the thread and ferrule of the pre-assembled joint body, insert the steel pipe into the joint body, and tighten the nut by hand (the steel pipe must be inserted to the end).

4、Tighten the nut until the ferrule catches the steel pipe. This turning point can be felt by the increase in tightening torque (pressure point).

5、After reaching the pressure point, tighten the nut 1/2 turn.

6、Remove the pre-assembled joint body and check the embedding of the edge of the ferrule. The visible protruding band must fill the front end of the ferrule. The ferrule can rotate slightly, but cannot move axially.

7、To install, apply lubricant to the thread of the joint body in the actual installation, tighten the compression nut with it until the tightening force can be felt increases, and then tighten 1/2 turn to complete the installation.
Repeat installation
All ferrule joints can be reassembled many times, but the parts must be undamaged and clean。

1、Insert the steel pipe into the joint body until the ferrule is close to the conical surface of the joint body, and tighten the nut by hand.

2、Tighten the nut with a wrench until the tightening torque increases sharply, and then tighten 1/4 to 1/2 turn.
an examination
The steel pipe can be removed to check whether the assembly meets the requirements: there should be even slight protrusions on the steel pipe at the end of the ferrule. The ferrule cannot slide back and forth, but a slight rotation is allowed.
Cause of leak
1、The steel pipe is not inserted all the way

2、The nut is not tightened

3、The outer surface of the steel pipe is scratched or the steel pipe is not round.

4、The steel pipe is too hard.
Previous page:Features and installation instructions of card sleeve joints (DIN2353 standard)
Next page:Commonly used terms in steel pipe standards
主站蜘蛛池模板: 天天干天天射天天爽 | 成人a在线观看 | 婷婷激情成人网 | 九九爱www免费人成视频 | 91色网址 | 一级毛片欧美真人视频 | 欧美日韩亚洲高清一区二区 | 性xxxx18免费观看视频软件 | 亚洲Aⅴ在线无码播放毛片一线天 | 中文乱码免费一区二区 | 日本中文字幕一区二区有限公司 | 国产亚洲精品久久久久久移动网络 | 二区三区在线播放 | 男人操女人视频免费 | 国产日产一区二区三区久久久久久 | 国产综合影院 | 91久久奴性调教 | 99re学生视频精品视频 | 欧美激情二区 | 秘书在办公室被躁到高潮 | 91视频精选 | 中国CHAIN同志GAY片国产 | 日本三级在线播放线观看免 | 小早川怜子久久精品中文字幕 | 免费黄色片一区二区 | 欧美喷水在线观看 | 在线中文字幕播放 | 亚洲天堂一区在线观看 | 337P日本欧洲亚洲大胆在线 | 欧洲成人一区二区 | 在线观看国产麻豆 | 国产精品久久久久久久久久白浆 | 抽插丰满内射高潮视频 | www.男女 | 尤物永久网站 | 精品综合网 | 91啦九色 | 伊人2222| 国产毛片女人高潮叫声 | 99国产精品欧美一区二区三区 | 无码人妻精品丰满熟妇区 |